.

Rail Bridge Work Causes Road Closures Through October

Metro North's installation of a safety walkway on Main Street bridge is causing traffic delays in Port Chester.

 

If you're planning a trip to Port Chester, better plan to add some time to your travel plans.

Lane Closures on South Main Street in Port Chester at Slater Street are expected to continue until the end of October as Metro North Commuter Railroad crews work on a New Haven Line bridge, according to the railroad.

Workers are installing a safety walkway on the Track 3 side — the north side — of the bridge, requiring construction vehicles to be in the roadway of South Main Street. The project began in August and is about 50 percent complete.

The $196,000 project has required one lane of traffic to be closed at a time. As workers build the walkway, Metropolitan Transportation Authority police officers have been assigned to traffic duty at the site.

Continue to expect short delays when driving in that area during the daytime work hours.

Boards

More »
Got a question? Something on your mind? Talk to your community, directly.
Note Article
Just a short thought to get the word out quickly about anything in your neighborhood.
Share something with your neighbors.What's on your mind?What's on your mind?Make an announcement, speak your mind, or sell somethingPost something
See more »